Intelligent Well Completion Design Select/Define
Our Client was planning a second drilling campaign for a challenging onshore, central African oil development. The initial naturally flowing vertical wells were performing below expectations and the client requested Axis carry out a review to both identify the root cause of this performance and propose alternative completion designs for the upcoming wells. This Phase 2 development included water injection and the new production wells also needed to accommodate artificial lift.
We provided a specialist production technology and completion design team and provided the client with comprehensive and detailed conceptual designs after completion of the following activities,
Detailed reservoir and well performance review, including,
- Reservoir development strategy
- Production and operations history
- Flow assurance
- Formation damage (primarily fines/sand management)
- Stimulation
- Equipment failure analysis
Develop Select gate designs for conceptual oil producers and water injectors, including,
- Functional requirements
- Key challenges
- Concept screening
- Upper and lower completion concept Select
Develop Define gate designs for conceptual oil producers and water injectors, including,
- Upper and lower completion Define
- BoD documentation
- Equipment failure analysis
- Intervention considerations (routine and non-routine)
Axis’ extensive knowledge of well/completion equipment and designs provided the client with access to the latest industry developments and ensured that the proposed designs were both cost effective and appropriate for complex, remote locations.